The fact
These structures, built in 2024-2025, were located in a fire corridor affected by the 2021 wildfire.
The defendant faces charges for endangering lives and potential criminal penalties.
Click the link to read an article on the topic:
These structures, built in 2024-2025, were located in a fire corridor affected by the 2021 wildfire.
The defendant faces charges for endangering lives and potential criminal penalties.