The fact
Rijkswaterstaat identified a weakness in the arch structure during preparatory works.
Safety can no longer be guaranteed without corrective measures.
Click the link to read an article on the topic:
Rijkswaterstaat identified a weakness in the arch structure during preparatory works.
Safety can no longer be guaranteed without corrective measures.