La Londe-les-Maures: €3.5 million project to protect Bormettes from flooding
Work to recalibrate the Carrubier river is underway to protect the Bormettes district.
Published 2sem1 sourceNotable
Lire en français
≈ 16s
The fact
The €3.5 million project aims to reduce flood risks.
Operations continue throughout the summer in this Var municipality.
Click the link to read an article on the topic: