The fact
EDF must ensure no residual radioactivity after dismantling.
The plant, shut down in 2020, is subject to public consultation.
Click the link to read an article on the topic:
EDF must ensure no residual radioactivity after dismantling.
The plant, shut down in 2020, is subject to public consultation.