The fact
The first site will open in Hertfordshire in March 2027.
The goal is to power a sovereign AI infrastructure with 1 GW capacity.
Click the link to read an article on the topic:
The first site will open in Hertfordshire in March 2027.
The goal is to power a sovereign AI infrastructure with 1 GW capacity.